Home > Application > robots > Loading/Unloading
Loading/Unloading
Application of GSK RB08 Robot on Automatic Production Line Loading/Unloading for Carrying on the Enclosure of Kettle from One Appliance Company
Customer Requirement:
- The robot replaces to the manual to complete the loading/unloading production of workpiece between the 63 tons of 5 punching machines and loading/unloading bars.
- The types of products are various and the production batch for single time does not various; the general capacity is strong of robot’s fixture and it is necessary to carry out the loading/unloading of production capture for different appearance.
- The dedicated processing time of production is 15 seconds; and the production capacity of assembly line is 200 pieces/hour.

Troubleshooting:
- Five tables of RB05 transportation robots, five sets of customized flexible grasps, one set of loading fixture and one set of unloading delivery line are equipped with five punching machine tools to completed the upper moulding, concave position, window molding, gap-cutting, unloading collection of gap molding.
- The grasp of robot is used the customized flexible design, which can be compatible with the enclosure capture, precise positioning of the overall kettles and guaranteed the continuous and stable produce of loading/unloading.
- The docking assembly line production of the forward and backward procedures can be carried out by using the automatic loading positioning mechanism and workpiece collection of belt line.

Application Effect:
- It is adopted with the compatible and flexible manipulator design, and solved the problem of various types and small batch production on the same production lone by the less manufacturing cost.
- The common production characters of the appliance industry is various types, strong compatible of equipments, frequency or single of the production procedure, labor intensive and short delivery time of production; and it uses that the robot replaces the manual automatic production can be reduced the production cost and guaranteed the production period.